Employer: Road Infrastructure Agency
Contractor: “Struma Lot 3.3” Consortium (comprising Patstroy-92 AD and Geostroy AD)
Project implementation period: 2015 – 2018

Description of the project:
Patstroy-92 AD and Geostroy AD together with their partners from “Struma Lot 3.3” Consortium started the construction of Lot 3.3 between Kresna and Sandanski from km 397+000 to km 420+624 under the project Struma Motorway – Lot 3.

It is a design-build project co-financed by the EU Cohesion Fund and the state budget under the Operational Programme “Transport and Transport Infrastructure” 2014-2020.

Lot 3.3 section is about 24 km long. The larger part of Struma Motorway alignment passes parallel to the Struma River and the existing road E-79. The project envisages construction of two road junctions within this section - near the village of Strumyani and near the town of Sandanski. In addition, 27 large bridge structures in total length of 2,985 m are to be erected, four recreation grounds, 16 local and agriculture road crossings as well as several crossings for utility communication networks.

For the first time in a motorway project in Bulgaria, Intelligent Transport Systems are going to be installed and integrated in the new Lot 3.3 section. They provide innovative solutions for vehicle counting and classification, real-time traffic management, weigh-in-motion and weather monitoring stations.

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

Този сайт използва бисквитки, ако продължите да използвате сайта ни вие се съгласявате с нашата политика за бисквитките.