Sitemap
Print
Български
Japan
spacer
spacer
Home  >   News
spacer
spacer
Completion and Putting into Operation of the Tramway Connecting Iskar Station and Tsarigradsko Shose Blvd
The first sod of project “Completion and Putting into Operation of the Tramway Connecting Iskar Station and Tsarigradsko Shose Blvd” was turned on 1 July 2009.
  more
spacer

spacer
The Repair Works on Simeonovsko Shose Blvd. in Sofia Have Been Completed
The road section on Simeonovsko Shose Blvd., repaired by Geotechmin’s subsidiary company Roads and Equipment EAD, was put into operation with an opening ceremony on August 13, 2009.
  more
spacer

spacer
Ellatzite-Med Reduces Carbon Dioxide Emissions by 30 %
GEOTECHMIN’s subsidiary Geostroy EAD has completed the construction of a new primary crushing unit (KET-3) at “Ellatzite” mine.
  more
spacer

spacer
Recultivation of Tailings Pond “Benkovski-I” Has Finished
The recultivation of tailings pond “Benkovski-I” is part of Ellatzite-Med’s program for elimination of past ecological damages.
  more
spacer

spacer
Page:    1  2  3  4  5  6  7    
Copyright © 2011 Geotechmin Company, Sofia, Bulgaria