BUSINESS UNITS

Employer: Ellatzite-Med AD and the Ministry of Environment and Water (MoEW), Bulgaria
Designer and contractor: Geotechmin OOD

Description of the project:
In 2004, after a tender procedure under the Bulgarian Public Procurement Law, Geotechmin OOD was nominated as a designer and contractor of the project "Reclamation of Benkovski-1 Tailings Pond". The proposed designs were approved by the Interdepartmental Expert Committee to the MoEW.

The project is divided into two subprojects which include the following works:

Subproject 1: Finalizing the Reclamation of the Slope and the Beach

  • reclamation of the downstream slope – 710 decares, including:
    • restoration of erosive areas and old ditches; additional reclamation – 95.60 decares
    • construction of berms, dewatering structures and collectors
    • forming of the slope and recultivation of the crest – 40,500 cub.m.
  • reclamation of the beach – 962 decares

Subproject 2: Reclamation of the Lake

  • dewatering – 402,000 cub.m.
  • drying, consolidation and restoration of the dewatered area – 795.7 decares
  • construction of a surface water lowering facility

Common for subprojects 1 and 2:

  • quarrying and transportation of earth mass – 500,000 cub.m.
  • biological recultivation – grassing, forestation, fertilizing, seeding, sprinkling, earthing up, mowing

BUSINESS UNITS

Truck

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet.

Storage

Vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duis dolore te feugait.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper.

Този сайт използва бисквитки, ако продължите да използвате сайта ни вие се съгласявате с нашата политика за бисквитките.