Strengthening of Iskar River – South of Sofia Airport
|
Employer: Directorate General "Civil Aviation Administration" and State Enterprise "Air Traffic Management", Bulgaria
Project execution period: 2002 – 2003
Description of the project:
Strengthening of the riverbed and dykes (total length – 1,125.5 m); supporting of Stari Silozi Quarry
Conducted works:
- Cutting and uprooting of trees – 320 units
- Filling with earth soils for supporting of Stari Silozi Quarry – 204,000 cub.m.
- Stone filling prism, including transition zones for quarry – 28,000 cub.m.
- Filling with earth soils for dikes for Iskar River correction – 67,000 cub.m.
- Drainage prisms and stone filling for Iskar River correction – 7,000 cub.m.
- Service roads around the Iskar River and in Stari Silozi Quarry
- Cell geosystem 10 cm – 36,500 sq.m.; cell geosystem 15 cm – 4,520 sq.m.
- Base from crushed gravel – 680 cub.m.; ballast base – 1,360 cub.m.
- Drainage concrete pipes – 12,600 sq.m.
- Drainage system HDPE pipes, diameter 200 mm – 1,140 m
- Grassing of the slopes – 104 decares
- Concrete works – 600 cub.m.
- Supply and installation of 3 m long reinforced concrete troughs – 145 units
- Installation of HDPE pipeline, diameter 315 mm – 200 m
- Installation of steel pipeline, diameter 400 mm – 100 m
- Drainage concrete pipes, diameter 300 mm – 780 m
- Supply and placement of bentonite (34.13 tons) – 5,250 sq.m.
- Piezometers (60 m) – 5 units
|
|