Closing and Recultivation of a Slag Dump

Employer: Umicore Med AD, Pirdop

Project execution period: 2000 – 2002

Description of the project:

This project occupies a central place in the Global Investment Program of Umicore Med AD for removal of old environmental damages. ОЕС-Belgium is the general contractor; Geotechmin OOD is the main sub-contractor.

Conducted works:

Excavation works, landscaping, drainage of surface waters, technical recultivation and consequent biological recultivation, as follows:

  • Excavated slag – 102,200 cub.m.
  • Embankment technical recultivation – 58,000 cub.m.
  • Embankment soil and topsoil – 48,500 cub.m.
  • Pipe culvert with diameter 500 mm and surface drainage ditches – 1,150 m
  • Reinforced concrete fence – 1,700 m
  • Grassing by tree mixes and bio-blankets – 139 decares
  • Erection of piezometers with depth 18 m – 3 pcs.
Recultivation of the slag dump
Forming of the slopes
Drainage ditch
Completed stage of the slag dump recultivation