Reconstruction of Tailings Pond “Buhovo” – Stage II
|
PHARE Project BG9807-03-01
Employer: Ministry of Environment and Water, Bulgaria
Project execution period: 2000 – 2001
Geotechmin OOD implemented this project jointly with OEC Bulgaria EOOD.
Conducted works:
- Clay fill – 600,000 cub.m.
- Drainage layer – 130,000 cub.m. of gravel
- New drainage system – concrete pipes, diameter 300 mm – 2,100 m
- Underground concrete reservoir – 500 cub.m.
- Pumping station equipped with two pumps, controls and automatics
- Pipeline – 300 m
- Transformer station
- Repair of dewatering ditch
- Construction of concrete barrage
- Landslide strengthening works
- Piezometers
- Temporary roads – 13 km
|
|